Schedules for Primavera P6
Build a P6 schedule step by step inside Excel, from your company’s dictionaries and the bill of quantities. Ganttwright builds it; P6 works out the dates.
01
Build, in Excel
A Ganttwright tab on Excel's ribbon and a panel beside the sheets walk you through six steps: dictionaries, the WBS, activities from the BOQ, resources and relationships.
02
Resources and costs
Each activity gets its resources from the dictionary, with a number each, and its cost from the BOQ, on one lump-sum cost resource.
03
Send to P6
Send lists what it will write, then writes it into P6 Professional's database through a small connector beside P6, with P6 open, or as an XER file. Press F5 in P6, then F9 for the dates.